A 400-TONNE delivery has left Teesside for the North Sea. The pair of massive yellow structures built by Wilton Engineering Services are to be used to protect wellheads for the Medway Project, one of three key oil and gas developments in the North Sea area operated by Dana Petroleum from the Netherlands.Read